A collection of recovered exploration records. Entries are presented newest-first. Timestamps and designations may conflict. Cross-references between entries are incomplete.
74 recovered logs · 69 exit achieved · 5 explorer lost · last recovery 2026-10-25
| Log ID | Designation | Primary Anomaly | Status | Date Recovered |
|---|---|---|---|---|
| 32-C29 | Condensate Return Gallery C-14 | Return flow independent of valve / temperature mismatch / delayed droplet impact / residual level change without flow | Exit achieved | 2026-09-04 |
| 31-B28 | Fire Pump Room F-19 | Discharge pressure independent of impeller / slope reversal / delayed vibration / residual flow without discharge | Exit achieved | 2026-09-03 |
| 30-A27 | Spill Containment Gallery S-18 | Containment volume mismatch / slope reversal / delayed footfall / residual liquid decrease without flow | Exit achieved | 2026-09-02 |
| 29-Z26 | Isolation Chamber I-9 | Pressure differential independent of seal state / delayed acoustic isolation / residual vibration without source | Exit achieved | 2026-09-01 |
| 28-Y25 | Compressor Gallery C-7 | Pressure independent of compressor state / slope reversal / delayed exhaust sound / magnetic field reversal | Exit achieved | 2026-08-31 |
| 27-X24 | Cooling Tower Plenum C-19 | Fan speed independent of motor / slope reversal / delayed droplet impact | Exit achieved | 2026-08-30 |
| 26-W23 | Sortation Hall S-23 | Belt velocity independent of motor / travel direction reversal / delayed impact sound | Exit achieved | 2026-08-29 |
| 25-V22 | Boiler Room B-18 | Steam pressure independent of valve / slope reversal / anticipatory ignition sound | Exit achieved | 2026-08-28 |
| 24-U21 | Filter House F-11 | Flow rate independent of valve / slope reversal / anticipatory pump sound | Exit achieved | 2026-08-27 |
| 23-T20 | Escalator Well E-14 | Step progression reversal / handrail speed mismatch / delayed step sound | Exit achieved | 2026-08-26 |
| 22-S19 | Battery Room B-9 | Cell voltage mismatch / slope reversal / delayed electrolyte sound | Exit achieved | 2026-08-25 |
| 21-R18 | Cable Vault C-8 | Cable length mismatch / slope reversal / delayed current sound | Exit achieved | 2026-08-24 |
| 20-Q17 | Generator Hall G-4 | Piston stroke reversal / vibration independent of RPM / delayed impact sound | Exit achieved | 2026-08-23 |
| 19-P16 | Archive Stack A-22 | Shelf height shift / title rearrangement / condensation mismatch | Exit achieved | 2026-08-22 |
| 18-O15 | Cafeteria C-11 | Chair inventory mismatch / slope reversal / cycling food trays | Exit achieved | 2026-08-21 |